Patio, Courtyard and Sett Cleaning in Hockley and the Quarter
Hockley’s hard surfaces are mostly shared and often historic. The Jewellery Quarter is workshops, converted works and apartment blocks, so the paving to clean is a courtyard inside a converted works, a loading apron behind a unit, a strip of blue brick setts down the side of a listed frontage, or a bin area serving twenty flats. Beyond the Quarter there are ordinary yards, paths and parking courts as well.
The historic fabric is the constraint that governs everything. The Quarter is a conservation area built around surviving Victorian workshops, so the ground outside a plain brick door is often original setts, granite kerb or engineering brick, with nothing laid this century. None of that takes the pressure people put through modern block paving. Add restricted parking and loading across the whole area and you have a job where planning where the van stops matters as much as the cleaning method does.
- Service
- Patio & Driveway Cleaning
- Area covered
- Hockley, B18
- Local authority
- Birmingham
- How we do it
- Rotary flat surface cleaner at a pressure the surface can take
- From our Selly Oak base
- About 20 minutes
- Price
- Quoted per property before we start (common questions)
- Booking
- Call or WhatsApp 07788 574283
Spillage, trade waste and sunless courtyards in the Jewellery Quarter
Commercial use, more than weather, drives most of this work in Hockley. A bar or cafe with tables out on its frontage generates spilled drink, food and chewing gum on the surface below, and that goes tacky and then black, with none of the green an algae film gives. Trade waste is the other half: a bin area serving a run of units or an apartment block takes leakage from bags and from bottle bins all week, and the residue sits in the joints between setts where a brush cannot reach it. Then there is the ordinary problem of an enclosed courtyard in a building four storeys high on every side, which gets almost no sun and grows a slick algae film across the whole floor.
- Bar and cafe frontages carrying drink spillage, food waste and gum, which blacken over time
- Trade waste and bottle bin areas serving units and blocks, with residue lodged in the joints between setts
- Enclosed courtyards in converted works, overshadowed on all four sides and slick with algae most of the year
- Loading aprons and workshop thresholds carrying oil, metal dust and polishing compound tracked out of the units
- Original blue brick setts, granite kerb and engineering brick that high pressure will visibly damage
- Parking courts and podium paving on the newer blocks, which are the only real hardstanding in B18
Soft washing the setts and granite, rotary cleaning the modern block
Identification comes first, and in the Quarter it matters a great deal. One Hockley address can hold original setts, granite, engineering brick, poured concrete and modern block paving within a few metres, and they do not want the same treatment. Sound concrete and modern block take rotary cleaning at working pressure. Setts, granite and old engineering brick are soft washed at low pressure, because pressure blows out the jointing and once the bedding under a sett is disturbed the job has become a paving repair. Bin and bottle areas get a degreasing step with real contact time, then a sanitising pass. Gum is treated as its own step.
- Every surface identified before anything starts, since one Quarter address routinely holds four different materials
- Setts, granite and old engineering brick soft washed only, so the jointing and bedding are left undisturbed
- Gum treated as its own step, not chased around with a pressure lance
- Bin and bottle areas degreased with dwell time and then sanitised, because rinsing alone leaves the smell behind
- Run-off contained and silt lifted out, with nothing washed towards a listed threshold or a basement light well
More detail on the equipment and the order of work: our patio & driveway cleaning method.
Courtyards, aprons and frontages across the Quarter
In the Quarter the booking usually comes from a business, a managing agent or a block committee, since the work is mostly shared ground. Hockley is about twenty minutes from Selly Oak, so a slot within the week is usually possible. Bars and venues want the frontage done before opening, which means early. Workshops and studios want the apron and threshold done when it least disturbs the bench. Visits run Mon to Fri 8am to 6pm and Sat 9am to 6pm, and an 8am start usually clears a frontage before trading begins. Blocks want the courtyard, the bin area and the entrance approach on a rota. Loading and parking restrictions across the Quarter decide the timing of all three, so a Hockley job is planned around where the van can legally stop and how far the kit has to travel from it, and that is worked out before the day.
Setts, carry distance and gum: what shapes a Hockley quote
Access and surface set the price here far more than area does. A courtyard reached only through a building, with every machine carried through a lobby and a fire door, takes longer than an open apron of the same size that the van can sit beside. Material matters too: soft washing setts is a slower method than rotary cleaning concrete, so a small area of original paving can cost more than a larger area of modern block. Condition is the third factor, and gum and trade waste residue are both priced as separate operations because they are separate operations. One thing that gets flagged before starting: oil that has soaked into a porous workshop apron over decades lightens substantially but does not disappear.
Monthly for bar frontages, autumn for enclosed courtyards
Bar and cafe frontages want the shortest interval of anything in B18, monthly or better through the trading season, because spillage and gum accumulate within days. Bin and bottle areas sit on a similar cycle for the same reason. An enclosed courtyard is an annual job, best done in autumn, since the point of it is getting a shaded floor through winter without it turning slippery. Workshop aprons vary entirely with what the unit does. Parking courts and podium paving on the newer blocks are ordinary surfaces on an ordinary one to two year cycle.
Nice man great at what he does
I’m very satisfied with the service I get
Great services delivered by Charles recommend for others
Hockley · Patio & Driveway Cleaning
Frequently asked questions
The shared ground: the courtyard, the bin area and the entrance approach. Those are usually commissioned by your managing agent or residents’ group, so the useful step is raising it with them, and we can quote them a schedule. If your flat has its own terrace or balcony paving, that can be cleaned on its own.
Yes. High pressure strips the face off old engineering brick and blows the jointing out from between setts, and once the bedding underneath is disturbed the setts start to rock and the surface needs relaying. In a conservation area that is an expensive mistake. Original paving here gets soft washed at low pressure with the solution doing the work, which takes longer and leaves the surface intact.
That is the only sensible way to do it. Frontage work happens early, before opening, when the tables are still in and the pavement is empty. It works best as a quick, frequent job, because on a licensed frontage the interval is what keeps it looking cared for. Gum and dried spillage both get worse the longer they are left, and a monthly pass costs less over a year than two heavy annual ones.
It gets planned in advance. Where the van can legally stop, and how far the equipment has to be carried from there, gets worked out before the visit is booked, and the timing is set to avoid the tightest restrictions. What helps is telling us in advance about a gate code, a service bay or a period when a courtyard is clear.
They are the one part of B18 with real hardstanding. The modern blocks have parking courts, podium paving and paved entrance approaches, and those are ordinary surfaces with ordinary problems: algae along the shaded edges, weed growth where the jointing sand has washed out, and oil drips in the parking bays. They clean up conventionally and sit on a normal one to two year cycle.
It can be made safe, but it will not be cured. A courtyard enclosed by four storeys of building gets very little direct light and stays damp, so algae returns whatever is done to it. The realistic position is an annual clean, timed for autumn, treated as a safety interval rather than a cosmetic one. Anyone promising a permanent fix on a surface in permanent shade is overselling it.
Other cleaning we do in Hockley
Tell us about the job
Send a few details or photos and we’ll come back with a clear price and an estimated time, with no obligation.
